The Western Sydney Airport Co (WSA) will deliver Sydney a second airport at Badgerys Creek in Sydney’s west. Construction of Western Sydney International (Nancy-Bird Walton) Airport is underway and on track to begin operations in 2026. The airport is a transformational infrastructure project that will generate economic activity and meet Sydney’s growing aviation needs. The airport will be a full service airport operating curfew free, delivering international, domestic and freight services.

AeroWest JV, comprising of BMD Constructions and Seymour Whyte Constructions, was awarded the Landside Civil and Building (LCB) Works Design & Construct Contract in December 2021.

The Scope that applies to the LCB Works is as listed below:

  • Ancillary facilities for aviation, support function, including airport operations, emergency operations, maintenance, airfield access gates, and waste management;
  • Ground transport and cycleway network, including connections to the terminal precinct, facilities within the site, M12 Motorway and Elizabeth Drive;
  • A road network in the north-east area of the Airport site, including connections to the terminal precinct, facilities within the site, M12 Motorway, and Elizabeth Drive;
  • Ground transport operation facilities, including carparks, electric vehicle charging stations, and a holding area for point-to-point transport services;
  • Sitewide Systems, including elements of audio-visual monitors, building and infrastructure systems, electronic security systems, network and telecommunication systems, and parking management systems;
  • Landscaping, including placement of final level topsoil and planting;
  • Wayfinding and signage for roads and facilities in and around the Site.
  • Stormwater drainage, including connection to the trunk drainage systems installed as part of the Bulk Earthworks Contractor Works and by other Project Contractors;
  • Sitewide Services, including trunk main networks within the Site for potable water, recycled water, wastewater and gas network, as well as the reticulation of LV power to facilities within the Site; and
  • Enabling infrastructure within the Site for High Voltage power and the ICN, which includes Fibre Optic Cable Backbone (FOCB).

Further information on the project is available at Western Sydney Airport Portal and updates on project construction activities here.

All subcontractors must be compliant with the Code for the Tendering and Performance of Building Works 2016 in order to be considered for project tendering opportunities. A sample copy of the Code Questionnaire and Declaration is provided below for your convenience. Please note that any subcontractors progressing with AeroWest JV will be required to complete the document at a later stage.

 

See the project here.

PROJECT HIGHLIGHTS

Suburban Rail Loop

Laing O'Rourke is the Managing Contractor for the Initial Works and Early Works (IWEW) package for the SRL East, and currently have 17 work packages open. Submit soon, these close 12 Oct 2022.

Project Banksia

Project Banksia will build the only cell-based influenza vaccine manufacturing facility in the Southern Hemisphere, to be built at Tullamarine.

Vast Solar 1

Vast Solar is developing VS1, a 30 MW Concentrating Solar Power (CSP) plant located in Port Augusta, South Australia. 

gateway arrow image
gateway arrow image

GATEWAY

Use our powerful networking database to find your next project (big and small), or source the best suppliers across Australia and New Zealand.

wedge

STAY INFORMED

Opportunities and insight delivered straight to your inbox. The latest procurement and supply chain news, events and projects in Australia and New Zealand. Just tell us your email address.

ICN HELP DESK

Phone 1300 961 139 (within Australia)
Phone +61 2 6285 2033 (outside Australia)
Email helpdesk@icn.org.au

Connect